Built properly. Finished on time.

Loft conversion

Dormer loft conversion

A rear dormer adding a double bedroom and en-suite to a 1930s semi. Steels and floor structure first, then insulation, fire doors and building control sign-off.

Dormer loft conversion

The brief

A three-bedroom 1930s semi with a large but unusable loft. The family needed a fourth bedroom with its own bathroom, and did not want to move.

What we did

  • Installed steels across the existing ceiling joists to carry the new floor independently of the ceilings below.
  • Built a flat-roof rear dormer, felted and finished, with the front elevation left untouched so the street scene is unchanged.
  • Formed the new staircase off the existing landing, keeping the head height compliant without losing a bedroom below.
  • Insulated to current standards between and over the rafters, and fitted fire doors and mains-linked alarms to meet the escape requirements.
  • Plumbed and fitted the en-suite, ran the electrics, plastered and decorated.

The result

A double bedroom with an en-suite, signed off by building control. Most of the structural work was done from the outside, so the family stayed in the house throughout.

Our work

Recent projects

A look at the kind of work we take on, from single rooms to whole builds.

Open-plan kitchen extension

Featured project

Open-plan kitchen extension

Extension Manchester

A single-storey rear extension opening the kitchen into the garden, with a structural steel to remove the back wall, underfloor heating throughout and full-width glazed doors.

View project

Enquiries

Whatever your building requirements, we’d be glad to help

Send us a few details and we will call you back to arrange a site visit and a written quotation.

We only use your details to respond to this enquiry.

Call